Kia Sephia/Shuma/Spectra

since 1995 of release

Repair and car operation



KIA of Sefia / Noise/range
+ 2. Engine
+ 3. Greasing system
+ 4. Cooling system
+ 5. Power supply system and release
+ 6. Fuel system
+ 7. Ignition system
+ 8. Coupling
- 9. Mechanical transmission
   9.1. Specifications
   9.2. Check of level of BF DOHC oil
   9.3. Check of level of TE DOHC oil
   9.4. Oil replacement
   9.5. Replacement of an oil sealing ring
   9.6. Removal and transmission installation
   9.7. Dismantling, check and assembly of a fifth / reverse gear and back cover of BF DOHC
   9.8. Dismantling, check and assembly of a fifth / reverse gear and back cover of TE DOHC
   9.9. Case of coupling and components of a case of a transmission of BF DOHC
   9.10. Case of coupling and components of a case of a transmission of TE DOHC
   9.11. Primary shaft of a transmission of BF DOHC
   9.12. Primary shaft of a transmission of TE DOHC
   9.13. Secondary shaft of a transmission of BF DOHC
   9.14. Secondary shaft of a transmission of TE DOHC
   9.15. Choice of adjusting laying
   9.16. Differential
   9.17. Gear shifting mechanism
+ 10. Automatic transmission
+ 11. Axes and power shafts
+ 12. Steering
+ 13. Wheels and tires
+ 14. Brake system
+ 15. Suspension bracket
+ 16. Body
+ 17. Central air
+ 18. Electric equipment


a7a4cf13

9.17. Gear shifting mechanism

GENERAL INFORMATION

Gear shifting mechanism

1–handle of the lever of gear shifting;
2–a box for storage of small subjects;
3–ashtray;
4–forward section of the central console;
5–cover of the lever of gear shifting;
6–lighter socket;
7–central console;
8–plate of protection of the engine;
9–catalytic converter;
10-nuts;
11-bolt;
12-clip;
13-nuts;

14-bolt;
15-draft of gear shifting;
16-nuts;
17-washer;
18-pipe;
19-plug;
20-plug;
27-gear shifting lever;
28-cover;
29-holder;
30-bottom nest of a spherical support;
31-draft of a choice of transfers

Repair

PERFORMANCE ORDER
1. Dismantling carry out in the sequence designated by figures in drawing.
2. Check a condition of all details and, if necessary, replace them.
3. Assembly is carried out to sequences of return to removal.
4. Removal and installation of separate details it is provided below.

Spring installation

PERFORMANCE ORDER
Be convinced that the spring end with a hook is established properly in arm deepening, as is shown in drawing.