Kia Sephia/Shuma/Spectra

since 1995 of release

Repair and car operation



KIA of Sefia / Noise/range
+ 2. Engine
+ 3. Greasing system
+ 4. Cooling system
+ 5. Power supply system and release
+ 6. Fuel system
+ 7. Ignition system
+ 8. Coupling
+ 9. Mechanical transmission
+ 10. Automatic transmission
- 11. Axes and power shafts
   11.1. Specifications
   11.2. Check люфта bearings of forward wheels
   11.3. Check of a condition of a power shaft
   11.4. Rotary fist and nave of a forward wheel
   11.5. Back axis
   11.6. Power shaft
   11.7. Repair of a rotary fist
   11.8. Type CV JOINT Tripoid
+ 12. Steering
+ 13. Wheels and tires
+ 14. Brake system
+ 15. Suspension bracket
+ 16. Body
+ 17. Central air
+ 18. Electric equipment


a7a4cf13

11.7. Repair of a rotary fist

GENERAL INFORMATION

Rotary fist

1–an oil sealing ring to (replace);
2–nave of a forward wheel;
3–a lock ring to (replace);
4–wheel bearing;
5–brake board;
6–rotary fist;
7–a directing bolt of fastening of a wheel

Dismantling

PERFORMANCE ORDER
1. Remove an oil sealing ring of a nave of a forward wheel.
2. A press with an opravka of the corresponding diameter squeeze out a nave from a rotary fist.
3. Remove a lock ring.

Prevention

If the internal ring of the bearing remains on a wheel nave, chisel internal section of a ring, till thickness of a wall of 0,5 mm. Then, a hammer and a chisel beat out the remains of internal section of a ring.


4. A press with an opravka of the corresponding diameter squeeze out the wheel bearing from a rotary fist.

Prevention

Needlessly do not remove a brake board. If the brake board acted in film, do not use it repeatedly.


5. Note the mutual provision of a brake board and a rotary fist, for the correct repeated installation of a brake board.
6. A hammer and a chisel bring down a brake board from a rotary fist.

Prevention

Needlessly do not remove directing bolts of fastening of a wheel. If directing bolts of fastening of a wheel acted in film, do not use them repeatedly.


7. A press with an opravka of the corresponding diameter squeeze out from a nave directing bolts of fastening of a wheel.

Assembly

PERFORMANCE ORDER
1. A press with an opravka of the corresponding diameter press in a nave new directing bolts of fastening of a wheel.
2. Put on a new brake board a label on the same place, as on the removed brake board.
3. Combine a label on a new brake board with a label on a rotary fist.
4. A press with an opravka of the corresponding diameter press a brake board on a rotary fist.
5. A press with an opravka of the corresponding diameter press the new bearing of a wheel.
6. A press with an opravka of the corresponding diameter press a nave.

Prevention

Use a new oil sealing ring. To establish a new oil sealing ring so that it was flush with an end face of a rotary fist.


7. A hammer and a special opravka OK993 331 016 establish a new oil sealing ring.